Arc Series Reactor for Furnace Transformer

1) Secondary voltage is low, only tens to hundreds of volts, and can be adjusted in a wide range .
2) Secondary currents are often in the thousands to tens of thousands of amperes.

Send InquiryChat Now
Product Details
image001

Arc series reactor for furnace transformer can be used for smelting various ferroalloy, silicon compounds, calcium carbide and other mineral heat furnace transformer, all low loss energy saving products.The cooling mode is self-cooling, strong oil-water cooling, etc.


Product Introduction:

1) Secondary voltage is low, only tens to hundreds of volts, and can be adjusted in a wide range .

2) Secondary currents are often in the thousands to tens of thousands of amperes.Electric furnace transformer is usually indoor device.

3) High resistance to high temperature.


Products Specification

Type

Rated power (kVA)

Vector group

Primary voltage(kV)

Secondary voltage(V)

Regulation voltage step

Type of taping

Short-circuit impedance(%)

No-load loss(kW)

On-load loss(kW)

Weight(kg)

Active part

Oil

Transportation

Total

HSSP-1500/35

1500

Yd11

35

290~157

4

OCTC

5.5

2.6

23

5300

2800

8700

9300

HSSP-3200/35

3200

D-Y,d0-11

35

240~138

5

OCTC

7

5.3

41.1

6160

4880

13000

14300

HSSPK-3200/35

3200

D-Y,d0-11

35

240~138

5

OCTC

18.65

5.3

91.1

6380

5420

13000

15200

HJSSP-5000/35

5000

Yd11

35

212~155

5

OCTC

7.5

9.3

55

8220

5660

15000

18000

HJSSP-5500/35

5500

Yd11

35

240~130

6

OCTC

7.5

9.1

52.5

8450

5660

15000

18000

HJSSP-7000/35

7000

Yd11

35

240~140

8

OCTC

7

9.4

77

10800

8000

22000

23100

HSSP-9000/35

9000

Yd11

35

320~180

8

OCTC

8.5

11

116

12600

6100

18000

24000

HSSP-12500/35

12500

Yd11

35

340~195

13

OCTC

9

13.9

154

13900

9800

28000

32000

HSSP-15000/35

15000

D-Y,d0-11

35

353~160

8

OCTC

8

20

107

19100

8100

31000

34500

Notes:1.The above data is only for reference,because the different user may have different requirements.
2.The above data will be vary with different connection and LV outlet type and also the data will be vary with LV rated max.current,etc.


Product feature and application

image004


Product qualification

image005_

With a professional R & D team, experienced workers, modernized working plant and equipment, the high quality product’s designing and manufacturing can be guaranteed well.


Deliver-shipping and serving

image009_


Delivery time

Normally, if with MR or ABB tap changer, the max. Deliver time about 120 days after technical drawings confirmed, if with Chinese brand tap changer, max. 90 days for any capacity and voltage range transformer.

Packing

The transformer main body usually in nude, and the accessories are packed in plywood case with steel structure, it’s worthy for ocean transportation.

Transportation

Usually, the total weight under 45 tons, it’s available by kinds of container, above 45 tons, it’s available by bulk ship.

After service

Usually, we will dispatch experienced technicians to client’s installation site for the supervision service within 15 working days after getting official information.


FAQ

1.How about the efficiency of transformer?

Generally small and medium sized transformer η = 95% ~ 98%, large transformer η = 99%.

2.What items does transformer minor repair include?

Externally inspect the entire transformer and its accessories, all contact connections, and eliminate defects.

3.What are the voltage regulating modes of electric furnace transformer?

Direct pressure regulation,Indirect voltage regulation.


Latest News

Transformer has always been the main equipment in the construction of modern power network.

With the growth of power infrastructure investment in recent years, the transformer market is also activated.

At the same time, the construction demand of smart grid projects is also driving a series of power equipment such as transformers to start the road of upgrading.

Hot Tags: arc series reactor for furnace transformer, China, manufacturers, suppliers, factory, customized, price, Induction Motor 3 Phase, 90 Degree Bevel Gear Reducer, Electric Arc Furnace Transformer For Melting, 300kw Electrical Motor, 3 Phase 8 Pole Induction Motor, 13.2kv To 480v Transformer Step Donw
Related Products
Inquiry
Back to top 升博体育官网